๐Ÿš€ Chapter 08: Implementation Guide

6-Month Roadmap

Phase 1 (Week 1-4): Planning

Phase 2 (Week 5-12): MVP

Phase 3 (Week 13-20): Expansion

Phase 4 (Week 21-26): Optimization

Success Metrics (KPIs)

ROI Calculation Example

Costs (Year 1): $220,000 (licenses, infrastructure, implementation, operations)

Savings (Year 1): $750,000 (search time, duplicate work, data quality, compliance)

ROI: 241% | Payback: 3.5 months

Best Practices

Common Pitfalls & Solutions

๐ŸŽ‰ Congratulations! You've completed the Data Catalog guide!

Reference Standards

Implementation guidance in WIA-DATA-007 builds on a layered selection of international standards covering security, privacy, accessibility, and software-quality:

Deployment Topologies

Three deployment topologies are supported:

  1. Single-tenant SaaS โ€” One catalog instance per organisation; lowest operational burden.
  2. Hybrid โ€” Metadata store within the organisation's network, search and UI hosted; addresses sovereignty constraints.
  3. Air-gapped โ€” Full deployment within the organisation's perimeter; required for highly classified environments.

Operational Readiness Checklist

Closing

A data catalog is, finally, a contract: that anyone in the organisation who needs to know what data exists, who owns it, and how to use it responsibly, can find that knowledge without asking. The standards in this chapter let the contract be written down, audited, and trusted across organisational boundaries.

Practical Application

An implementation is ready for real workload when seven indicators are simultaneously green:

  1. Search latency 95th percentile under one second on production data volumes.
  2. Catalog ingest end-to-end latency within the published SLO (five minutes for push, twenty-four hours for pull).
  3. Lineage coverage above seventy percent of regulated reporting paths.
  4. Quality scoring runs nightly without operational toil.
  5. WCAG 2.2 Level AA conformance verified by automated and manual review.
  6. RFC 9457 problem-detail responses on the public API; rate-limit headers emitted on all throttled endpoints.
  7. Disaster-recovery drill completed within the past twelve months, with RTO/RPO matching the ISO/IEC 27031:2011 expectations for the deployment topology.

Until all seven are green, the catalog is in pilot. After all seven are green, the catalog is the operating record for data in the organisation, and it can be relied on by regulated processes that previously depended on email and spreadsheets.

WIA-DATA-007 โ€” Conformance with ISO/IEC 11179, W3C DCAT v3, ISO/IEC 25012, FAIR principles. Citations per CITATION-POLICY.md ยง2.1 ALLOW.