5.1 The Environment as the Primary Design Driver

Terrestrial mining equipment relies on mass, gravity, air, and a nearby repair crew. Space mining has none of these. Every machine described in this chapter is shaped by a handful of environmental facts that hold across the Moon, near-Earth asteroids, and Mars.

These facts explain why the standard's interface layer is not concerned with a single machine. Its job is to let autonomous or semi-autonomous equipment from different vendors be commanded, observed, and audited across links that are slow, intermittent, and expensive.

5.2 Why the Interface Layer Assumes an Unreliable Link

Phase 2 of the standard defines the API layer on which equipment control is carried. Several of its normative rules read like generic web-service hygiene, but they matter more when the client is a ground operator working through a delayed relay.

The remaining sections in this chapter take each family of mining equipment in turn and show which of these interface behaviours it leans on most.

로봇 채굴 시스템

5.3 Anatomy of a Robotic Mining System

A robotic mining operation is a chain of cooperating machines rather than a single vehicle. A typical chain includes the following elements:

The four roles defined in Phase 2 map naturally onto this chain.

Standard roleMining-system interpretationObligation from the standard
ProducerA machine or ground planner emitting telemetry, status, or commandsEmit only well-formed, signed, and authorised messages
ConsumerA hauler accepting a task, or a ground archive persisting telemetryValidate, authorise, and audit every received item
AuthorityThe party that issues credentials to machines and operatorsMaintain revocation lists and attestation logs
OperatorThe team running the deploymentMonitor health, capacity, and compliance posture

The same physical machine can be a Producer of telemetry and a Consumer of tasks. The standard asks each side to validate what it receives. This matters in a chain where an excavator trusts a hauler's "ready" message, and a faulty or compromised unit would otherwise propagate a bad state down the line.

5.4 Addressing Machines and Issuing Commands

Phase 2 prescribes REST-style resource paths with snake_case segments and canonical UUID identifiers (the encoding comes from Phase 1). Four path shapes are defined:

/v1/{collection}                        # collection
/v1/{collection}/{id}                    # member
/v1/{collection}/{id}:{action}           # custom action (POST)
/v1/{collection}/{id}/{sub_collection}   # nested collection

The shape that matters most for equipment is the custom action, issued as a POST against a specific member. Starting a dig, pausing a drill, or returning a vehicle to base are actions on an identified machine rather than edits to a record. Which actions a deployment exposes is determined by its published interface description, which implementations place at /api/openapi.yaml, /api/protocol.proto, or /api/asyncapi.yaml depending on the style of interface. Any deviation from the canonical surface must be listed as a numbered exception in the conformance report.

Commands over a delayed link are routinely retried, because the operator does not know whether a missing acknowledgement means "never arrived" or "executed, reply lost." Phase 2 handles this with the Idempotency-Key header:

POST /v1/{collection}/{id}:{action}
Idempotency-Key: <client-generated unique value>

Servers MUST cache the response keyed by the pair (principal, key) for at least 24 hours and replay the same response on retry. For a physical machine, this is the difference between a resent "start excavation cycle" command being a harmless repeat and being a second, unintended cycle.

굴착 및 파쇄 기술

5.5 Excavation and Fragmentation Methods

Different targets call for different breaking and collecting methods. The main families follow, with the reason each is chosen.

Because regolith properties vary, a machine often has to adjust tool parameters from force and torque feedback rather than follow a fixed plan. That capability is the hinge between the equipment described here and the autonomy discussion later in this chapter.

5.6 Excavation as a Long-Running Task

An excavation cycle is neither an instant read nor a quick write. Phase 2 classifies operations and fixes timeouts per class; a deployment's task model should place excavation work into the appropriate one.

Operation classDefault timeoutMaximum timeout
Synchronous read5 s30 s
Synchronous write10 s60 s
Long-running task5 min30 min
Streaming session30 min8 h
Batch import60 min24 h

Operators MAY tighten these defaults but MUST NOT relax them past the maximums without an explicit waiver from the WIA Working Group. Starting a drill sequence fits the long-running class. Live vibration or torque monitoring during that sequence fits a streaming session. Uploading a day's accumulated logs after a communications gap fits a batch import.

State transitions of long-running tasks MUST be published as events to a durable channel so that downstream consumers can rebuild state. A ground system that was offline when a drill reached "stalled" can replay the event history on reconnect. Cancellation, as noted in 5.2, must be honoured inside the declared window. In practice, the cancel path is the one most worth rehearsing, since a machine stuck against bedrock should stop quickly and predictably.

정제 및 분리 공정

5.7 Beneficiation and Extraction Routes

Raw regolith or asteroid material is rarely the product. Processing separates a valuable fraction and then converts it into something usable, such as oxygen, water, metals, or propellant. Routes commonly discussed for off-world use include:

Each route has its own mass balance, energy appetite, and consumables. Hydrogen-based routes, for example, require that the reagent be recycled or resupplied. Plants therefore track not only throughput but also reagent inventory, thermal state, and product purity.

5.8 Keeping Process Data Trustworthy

Processing plants generate large volumes of measurements, and decisions about yield, quality, and ownership of product depend on them. Phase 2 contributes several mechanisms that fit this setting.

The measurement semantics of purity, yield, and composition belong to the Phase 1 data formats. The interface layer does not define them, but it ensures that whatever is recorded is delivered, versioned, and auditable.

무중력 제조 기술

5.9 Manufacturing Where Nothing Settles

In microgravity, buoyancy-driven convection disappears, liquids and gases do not separate by density, and molten material can be held without a container. This opens possibilities and creates difficulties.

From an interface perspective, manufacturing jobs are long and data-rich. A build may stream sensor data for its whole duration, which suits the streaming session class (default 30 minutes, maximum 8 hours). Resulting part records can be imported in bulk through the batch class. When a build step must be abandoned, the same cancellation guarantee as for excavation applies, and the event stream records at which step it stopped so a partial part can be flagged rather than accepted.

에너지 시스템

5.10 Power as the Scheduling Constraint

Energy often determines which operations can run at all. Options for off-world mining power include:

Power shortfalls show up at the interface as saturation and dependency failures. Phase 2 reserves two codes that operators can bind to common runbooks:

CodeSymptom per the standardRequired action
E_DEPENDENCY_DOWNUpstream resource unavailableRetry with back-off, surface degraded mode
E_CAPACITYResource is saturatedReject with retry-after, page on-call if persistent

A deployment may decide, for example, that a request for a power-hungry process step during a low-power period is answered with E_CAPACITY and a retry-after, rather than started and abandoned half-way. The standard does not prescribe that mapping. It guarantees that whatever mapping is chosen will use the shared codes, so tools written for one vendor's plant can interpret another's refusals.

로봇 자율성 레벨

5.11 Autonomy Tiers and the Authority to Act

The material for this standard does not define a numbered autonomy scale, so this section uses the common conceptual ladder from the robotics field rather than a normative one.

The higher the tier, the more the system depends on the standard's identity and audit provisions. A machine that decides for itself must still act only on authorised intent. Phase 2 therefore requires that inter-service traffic use mutual TLS with certificates rotated at most every 90 days. Identity-bearing tokens must be short-lived (15 minutes or less) and bound to the caller's network identity through a sender-constrained mechanism, either DPoP or mTLS-bound. Sensitive payload fields are encrypted at the application layer with per-tenant keys in an HSM. A stolen command token is a much more serious matter when it can drive a physical machine.

Higher autonomy also changes what operators want from the record. Because every state-changing operation is audited and long-running task transitions are published as events, a human can review not just what a machine did but the sequence of states it passed through, which is the practical basis for trusting a system that acts between contact windows.

장비 신뢰성 및 유지보수

5.12 Reliability, Maintenance, and the Road to the Next Chapter

Mining machines in space fail from abrasion, thermal cycling, dust intrusion, and fatigue, and no technician can walk out to fix them. Established practice includes redundancy for critical functions, modular line-replaceable units that a robot or visiting crew can swap, failure-mode analysis during design, condition monitoring to catch wear before breakdown, and spare-part strategies that weigh launch cost against downtime. Where possible, machines are designed to keep working at reduced capability, for instance by driving on fewer wheels or by running a plant at lower throughput.

The standard's non-functional targets belong to the service layer rather than to hardware, and they should not be confused with equipment reliability. They include availability of at least 99.9 % monthly, mean time to recovery of 15 minutes or less, and 100 % audit completeness for state-changing operations. Their relevance to maintenance is indirect but real: the monitoring plane that reports a failing bearing must itself be available, and its record of the maintenance action must be complete. Observability requirements support this, with Prometheus or OTLP metrics for each operation class, structured JSON logs with W3C Trace Context identifiers, traces tagged with the canonical resource identifier, and durable events for task state changes.

In summary, this chapter described the physical problem and showed how Phase 2 meets it: deterministic rejection of bad input, idempotent commands across lossy links, class-based timeouts with guaranteed cancellation, event-sourced task state, shared failure codes, and complete audit. The chapter also treated excavation, refining, microgravity fabrication, power, and autonomy as the equipment families that exercise these rules in different ways.

Machines that mine, refine, and build are only valuable if the material they produce can be accounted for. The next chapter moves from what the equipment does to what happens to its output, and from the interface that commands the machines to the records that describe the resources they recover.