☁️ WIA-ENE-014 Energy Cloud

Phase 1 Specification

Version: 1.0.0 | Status: Draft | Date: 2025-12-25

1. Overview

Phase 1 of the WIA-ENE-014 Energy Cloud standard focuses on foundational infrastructure and core data models virtual power plant implementation and resource aggregation energy trading and market integration. This specification defines the technical requirements, protocols, and implementation guidelines for achieving compliance with this phase.

2. Scope and Objectives

Phase 1 encompasses the following key areas:

3. Technical Requirements

Requirement ID Category Description Priority
ENE-101 Data Format All energy data must conform to WIA-ENE-014 JSON schema with timestamp, meterId, and readings Critical
ENE-102 Security TLS 1.3 encryption required for all data transmission with AES-256 for data at rest Critical
ENE-103 Performance System must handle 10,000 100,000 500,000 messages per second with p99 latency < 200ms High
ENE-104 Availability 99.5% 99.9% 99.95% uptime SLA required High
ENE-105 Integration RESTful API compliance with OpenAPI 3.0 specification Medium

4. Data Model Specification

{
  "standard": "WIA-ENE-014",
  "version": "1.0",
  "phase": 1,
  "timestamp": "2025-12-25T10:30:00Z",
  "energyData": {
    "consumption": {
      "total": 1250.5,
      "unit": "kWh",
      
      
      "quality": "high"
    },
    
    
    
    
  }
}
        

5. Implementation Guidelines

5.1 Cloud Infrastructure

Recommended cloud architecture for Phase 1:

5.2 Security Configuration

6. Testing and Validation

Phase 1 implementations must pass the following test suites:

7. Compliance and Certification

Organizations implementing Phase 1 must demonstrate compliance with:

8. Migration from Previous Phases

This is the foundational phase. No migration required.

弘益人間 (홍익인간) · Benefit All Humanity

Phase 1 brings us closer to a sustainable energy future through intelligent cloud-based coordination of distributed energy resources.