Version: 1.0.0 | Status: Draft | Date: 2025-12-25
Phase 2 of the WIA-ENE-014 Energy Cloud standard focuses on virtual power plant implementation and resource aggregation energy trading and market integration. This specification defines the technical requirements, protocols, and implementation guidelines for achieving compliance with this phase.
Phase 2 encompasses the following key areas:
| Requirement ID | Category | Description | Priority |
|---|---|---|---|
| ENE-201 | Data Format | All energy data must conform to WIA-ENE-014 JSON schema with timestamp, meterId, and readings | Critical |
| ENE-202 | Security | TLS 1.3 encryption required for all data transmission with AES-256 for data at rest | Critical |
| ENE-203 | Performance | System must handle 100,000 500,000 messages per second with p99 latency < 200ms | High |
| ENE-204 | Availability | 99.9% 99.95% uptime SLA required | High |
| ENE-205 | Integration | RESTful API compliance with OpenAPI 3.0 specification | Medium |
{
"standard": "WIA-ENE-014",
"version": "1.0",
"phase": 2,
"timestamp": "2025-12-25T10:30:00Z",
"energyData": {
"consumption": {
"total": 1250.5,
"unit": "kWh",
"breakdown": { "residential": 450.2, "commercial": 550.8, "industrial": 249.5 },
"quality": "high"
},
"generation": { "total": 1300.0, "sources": { "solar": 420.5, "wind": 380.2 } },
"vpp": { "vppId": "VPP-001", "capacity": 50000, "currentOutput": 40500 },
}
}
Recommended cloud architecture for Phase 2:
Phase 2 implementations must pass the following test suites:
Organizations implementing Phase 2 must demonstrate compliance with:
Migration from Phase 1 to Phase 2 requires:
弘益人間 (홍익인간) · Benefit All Humanity
Phase 2 brings us closer to a sustainable energy future through intelligent cloud-based coordination of distributed energy resources.